Regarding ordering, objects are stacked in the order that they are drawn, the idea being that you lay down symbols and then add connections using Doglegs/Cables (which will then cover the IO stubs). If you have created the connections BEFORE adding the symbol then you will need to re-order on a connection by connection basis, but you may find that using the FastKey combination Ctrl+Shift+F for Move to Front saves time.
I hope this is helpful. Kind regards,Rob RobinsonStardraw.com
I would like to be able to add connectors to my schematics (which are mixed in with pictorials).
Speaking of connectors, when I use connectors, it would be nice if the cyan color retreated below the line color, it looks weird as on the final drawing. Is there a quick global way of addressing that problem, (I am aware I can do a draw order per line, but that is time consuming).
Thanks