Product-based Connection Schedule


Author
Message
Hughes
H
Supreme Being (369 reputation)Supreme Being (369 reputation)Supreme Being (369 reputation)Supreme Being (369 reputation)Supreme Being (369 reputation)Supreme Being (369 reputation)Supreme Being (369 reputation)Supreme Being (369 reputation)Supreme Being (369 reputation)
Group: Forum Members
Posts: 43, Visits: 470
Hi Rob,

Hoping for that some other users will also find this feature useful, I strike back again with this functionality requested during ISE2020.

The purpose of this Connection Schedule is to have a report to verify on site, device per device (Product), if all the cables are physically labelled and connected as designed in SD7.

Here is what I have in mind:

An export functionality to generate a spreadsheet that contains all the Ports of all the Products in the project.
Thus there is a line for each Port even if there isn't a cable connected to this Port.

Each line contains:
All Attributes of the Product, Port label and the drawing where the Product is placed.
All Attributes of the Cable.
All Attributes of the Feathers.
An additional field/column "Connected Label" with the content of the Cable Label actually connected (Start Label or End Label) to the Port.
An additional field/column "Direction" with a flag indicating the direction of the drawn cable. Could be like "->" if it's the Start Label that is connected or "<-" if it's the End Label that is connected.
All the Attributes and the Port of the Product where the other end of the cable is connected to. (Maybe the tricky part for you)
 
Unlike the Cable Schedule, the first line with field/column headers should have a unique name (e.g. Product-Description, Cable-Description, OtherEndProduct-Description). By the way if this could be applied to Cable Schedule...

Thank You,
Hughes

GO

Merge Selected

Merge into selected topic...



Merge into merge target...



Merge into a specific topic ID...





Similar Topics

Reading This Topic

Login

Explore
Messages
Mentions
Search