+x Rob Robinson - 8/9/2017 2:59:53 PMHi John,I am not saying that there should never be different drawings; at it's heart SD7.2 was designed to cater for multiple drawings in a project. The OP's stated objective is to produce a Cable Schedule with a single row that shows the Cables start and end connection. We are exploring the best and easiest way to do this. The easiest, in all probability, is to generate a drawing which contains the start and end connections of the cables, solely for the purposes of the Cable Schedule. Other drawings could be used as adjuncts/detail for parts of the system, of course, but right now it's all about this Cable Schedule question.
+x Rob Robinson - 11/27/2017 3:17:27 PMHi Novski,Currently no; there is not a way to show a single cable that starts in one drawing and ends in another. This is something we are exploring for the future.